4712 54th St
Property Summary
FOR 5 PEOPLE: SPACIOUS 4-BEDROOM HOME NEAR SDSU $5,200/MONTH SPACIOUS 4-BEDROOM HOME NEAR SDSU Available August 28, 2026 Spacious 4-bedroom, 3-bath home located approximately 1.1 miles from San Diego State University. Offering approximately 1,900 sq ft of living space, this home is ideal for a household or group looking for plenty of room, multiple living areas, and convenient access to SDSU and surrounding San Diego. RENT: $5,200 PER MONTH ENTIRE HOME The home includes 4 bedrooms, 3 bathrooms, a spacious living room, separate family room or study area, updated kitchen, luxury vinyl flooring, and plenty of natural light. BEDROOMS Oversized Primary Suite approximately 302 sq ft with private bathroom and walk-in closet. Spacious enough to accomodate up to two approved occupants. Room 1 approximately 146 sq ft with shared bathroom. Room 2 approximately 123 sq ft with shared bathroom. Room 3 approximately 133 sq ft with private bathroom. The home can accommodate up to five approved occupants, subject to lease terms and applicable occupancy requirements. HOME FEATURES Updated kitchen Spacious living room Separate family room or study area Four bedrooms and three bathrooms Luxury vinyl flooring Bright natural light Driveway parking with temporary construction-related limitations Additional street parking Approximately 1.1 miles from SDSU Convenient access to shopping, restaurants, Downtown San Diego, I-8 and I-15 LAUNDRY NOTICE Due to ongoing ADU construction, a washer and dryer will not be available initially. A new washer and dryer are expected to be provided within approximately 3 to 4 months, once the applicable phase of the ADU construction is completed. LEASE TERMS 12-month lease preferred No smoking Renter's insurance required Guarantors or co-signers may be considered All adult occupants must complete the required application and screening process ADU CONSTRUCTION DISCLOSURE A separate ADU is currently under construction in the backyard. The major and most disruptive phases of construction, including demolition, excavation, compaction, structural framing, and other heavy construction work, have been completed. Beginning this week, the project is moving into the finishing stages, which are expected to include insulation, exterior waterproofing, drywall, stucco, flooring, kitchen installation, lighting, and other interior finish work. Some intermittent daytime construction activity and noise should still be expected until the ADU is completed, but the most disruptive phases of the project are now behind us. Driveway access may occasionally be limited during construction, but additional street parking is available. 12-month lease preferred. Entire home lease preferred. Responsible student groups and roommates welcome. No smoking. Renter's insurance required. Street parking available.
Highlights
- Quality Living
Checked 19 hours ago
Policies & Fees
Amenities
- Parking